WEST HAVEN
2008 West 2550 South
West Haven, UT 84401

(801) 627-8156
SALT LAKE CITY
270 West 2950 South
Salt Lake City, Utah 84115

(801) 975-0190
"We Hold It All Together!"
Toll Free:  (866) 931-8027
 
/images/store/27/11-CFC-Connectors.jpg/images/store/27/21-CFC-Connectors.jpg/images/store/27/31-CFC-Connectors.jpg/images/store/27/41-CFC-Connectors.jpg/images/store/27/51-CFC-Connectors.jpg/images/store/27/61-CFC-Connectors.jpg
/images/store/27/12-CFC-Connectors.jpg/images/store/27/22-CFC-Connectors.jpg/images/store/27/32-CFC-Connectors.jpg/images/store/27/42-CFC-Connectors.jpg/images/store/27/52-CFC-Connectors.jpg/images/store/27/62-CFC-Connectors.jpg
/images/store/27/13-CFC-Connectors.jpg/images/store/27/23-CFC-Connectors.jpg/images/store/27/33-CFC-Connectors.jpg/images/store/27/43-CFC-Connectors.jpg/images/store/27/53-CFC-Connectors.jpg/images/store/27/63-CFC-Connectors.jpg
/images/store/27/14-CFC-Connectors.jpg/images/store/27/24-CFC-Connectors.jpg/images/store/27/34-CFC-Connectors.jpg/images/store/27/44-CFC-Connectors.jpg/images/store/27/54-CFC-Connectors.jpg/images/store/27/64-CFC-Connectors.jpg
 

Search:

Metal Rib Forming Lath

Metal Rib Forming Lath

Permanent Formwork for Concrete
(click image to enlarge)
Quick Overview
  • In all joint applications, metal ribbed sheets can give considerable performance and economic benefits when compared with traditional solutions.
  • Achieves signigicant reductions on the concrete pressures normally associated with conventional formwork.
  • Can be placed before rebar which are then installed by piercing through the mesh area.
  • Minimizes preparation of the joint surface, so reinforcement placing can continue without a break.
  • Allows a high rate of rise of concrete.
  • Enables the pour to be visually monitored.
  • Reduces the risks of voids and honeycombing.
  • Can save time. It is left in place so formwork stripping is eliminated. Only the supports are removed.
  • Often can be supported by existing or extra reinforcement. The whole structure can be left in the concrete which eliminates the placing and removal of temporary supports.
  • No need to clean, reface and oil formwork.
Interested in this item or want more information?
Call Mon. through Fri. 6:30 AM - 5:00 PM PST
Phone: (866) 931-8027
Email: Sales@CFCdelivers.com

Can't find what you want? Give us a call and we can help you find it.
Details
Metal rib forming lath is the cost effective answer for forming applications. When concrete is poured behind it, the angled tabs of mesh become embedded. Metal Ribbed sheets provide control over the quality of the joint - which is as strong in bond and shear, as a well prepared joint.

PROPERTIES METAL RIB
Sheet Size 27" X 97"
Surface / Sheet 18 sq. ft.
Pallet 250 sheets
Overlap 2"
Support Spacing 24" @ 210 psf
Sheet Thickness 26 Ga.
 
Search:
Facebook LinkedIn Twitter
 
© 2008- CFC | All Rights Reserved
 
Powered by 48ws.com